Analysis of options for superstructure of the CHP by the gas turbine installation
Keywords:
gas turbine installation; steam copper; combined steam-gas installation; mathematical modeling.Abstract
We consider the principled schemes of a combined-cycle installation with recycling of combustion products from gas turbines AL-31STE in a steam boiler E-230-100GO in the steam-turbine unit IH-3090/10 with various combinations of waste heat. The analysis of the energy performance of the considered schemes.Downloads
Published
2018-30-08
Issue
Section
AIRCRAFT AND ROCKET AND SPACE TECHNOLOGY